1-1/4" MNPT Quick Removal Coupling – Sanitary Clamp Style Metering Valve Disconnect Upgrade for Portable Abrasive Blasters
Model: PB-SC114FI
Category: Surface Preparation → Sandblasting Equipment → Valves, Controls & Quick Disconnect Upgrades
Type: 1-1/4" MNPT Quick Removal Coupling – Sanitary Clamp Style Metering Valve Disconnect Upgrade
The 1-1/4" MNPT Quick Removal Coupling Metering Valve Disconnect Upgrade (Part #PB-SC114FI) is a purpose-built solution designed to upgrade portable abrasive blasting systems with fast, tool-free metering valve removal.
Key Features & Benefits
- Metering valve disconnect upgrade for portable abrasive blasters
- 1-1/4" MNPT connection for standard system integration
- Sanitary clamp-style quick removal coupling for tool-free servicing
- Allows fast removal of metering valve for maintenance or clog clearing
- Heavy wall Schedule 80 construction for extended service life
- Wrench flats included for easy installation and secure tightening
- Reduces downtime and maintenance effort in the field
- Improves system efficiency and serviceability
Technical Specifications
- Product Name: Metering Valve Quick Removal Coupling Upgrade
- Part Number: PB-SC114FI
- Size: 1-1/4"
- Connection Type: MNPT x Sanitary Clamp
- Construction: Heavy Wall Schedule 80 Pipe
- Weight: 1.40 lbs
- Application: Portable Abrasive Blasting Systems
- Condition: New
Compatibility Notes
- Designed for portable abrasive blasting systems with 1-1/4" connections
- Integrates with metering valve assemblies and quick removal coupling components
- Compatible with sanitary clamp-style systems (requires clamp + gasket)
- Ideal for Schmidt, Axxiom, and similar blasting setups
- Verify system configuration and connection compatibility prior to installation
Typical Applications
- Portable abrasive blasting equipment upgrades
- Metering valve quick disconnect setups
- Field maintenance and clog removal access points
- Industrial blasting systems requiring fast servicing
Performance Benefits
- Enables rapid metering valve removal without tools
- Minimizes downtime during maintenance or clog clearing
- Heavy-duty Schedule 80 construction ensures long-term durability
- Improves efficiency and ease of service in field operations
- Maintains secure, leak-resistant system connections